Quantcast
Channel: SCN : Unanswered Discussions - SAP NetWeaver Development Infrastructure (NWDI)
Viewing all articles
Browse latest Browse all 562

NWDI with CM Services and CTS+: Correct setup for Process Orchestration

$
0
0

Hi experts,

 

I have a basic question to understand the concept of CM Services of NWDI exactly.

 

We have a Process Orchestration landscape in which we are doing both PI and BPM developments. We plan to set up NWDI together with CTS+. We have 3 systems: Dev, QA and Prod.

 

I was able to configure everything so far on the development system to ensure that development works (both PI and BPM). However there are still some open questions to understand the concept completely:

 

1. How do we need to set up the TMS settings correctly? We have done it as follows so far. Do we also need "DC" method? And if yes, why? If I save this configuration, the development configuration in NWDI is created without a runtime system.

 

 

2. Do we need a runtime system or can we configure everything without a runtime system? What is the purpose of it? Do we have 1 runtime system for all 3 stages DEV, QA and PROD or is the runtime system only PROD system?

 

Thanks for clarification and Best Regards

H.


Viewing all articles
Browse latest Browse all 562

Trending Articles