Quantcast
Channel: SCN : Unanswered Discussions - SAP NetWeaver Development Infrastructure (NWDI)
Viewing all articles
Browse latest Browse all 562

How to transfer MII transaction from D to Q to P System with CMS – Change Management Service and NWDI?

$
0
0

Hi guys,

 

I configured SLD and NWDI on Server xyz02 with wizard.

I configured MII to NWDI with wizard “Integration of MII with existing NWDI” on Server xyz04 (D-system) and xyz03 (Q-system).

 

That works fine!

1.png

2.png3.png

 

the cbs - component build service shows the following

8.png

 

In CMS – change management service i see MIIDEV for server xyz04 (D-System) and MIIQS for server xyz03 (Q-System).

 

I configured in MIIDEV - landscape configurator – Track Data - “runtime systems” the following

4.png

  • “track connections”

5.png

 

 

I configured in MIIQS - landscape configurator – Track Data - “runtime systems” the following6.png

  • “track connections”

7.png

 

How I transport the transaction "1MIITest" from D to Q? its the right way with cms? whats wrong?

I found no documentation or how to guide for that issue.

 

Thanks for help!

Markus


Viewing all articles
Browse latest Browse all 562

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>