Setting up a DIM - OAP track in CMS

$
0
0

All,

 

Our current project normally used only the OAP track for former development, but since the new policy of doing it in a DIM-OAP street they have a track which contain the specific DIM runtime systems and the DTR url and CBS url together with the specific SC.

 

Now they wanted to move on via CMS (Q4 they are coming over to CTS+) into the OAP at going live.

 

So I created another track with the same SC as the DIM track, configured the Runtime systems as 'development', 'test' and 'production'. When this was done and saved, I used 'track connections' option setting the DIM track ID to be the source and the target the OAP track. I also marked the option to transport only the things which been developed.

I did not use the CBS or DTR URLs in the OAP track.

 

Now my question, did I do the change right?

 

What needed is that the things developped in D go via I to M and than to O, A and finally in production.

 

I had read some different documents, but those more or like were stating the option on having supply multiple production systems from one source track.